formats vaccin

These operations consumed hours, immobilising the line and leading to several negative consequences :

  • Inoperable line : No production could occur during the format change.
  • Team demobilisation : A portion of the staff was underutilised.
  • Technical frustration : Inaccurate adjustments during restart caused stress and errors.

Using the SMED method, the objectives were to :

  1. Segment operations : Identify complete subassemblies to replace, converting hours of disassembly into minutes of swapping parts.
  2. Optimise logistics : Use prepared trolleys containing replacement parts, enabling changes during hidden time.
  3. Prevent errors : Implement error-proofing devices to minimise incorrect assembly.
  4. Standardise processes : Create clear procedures to ensure a quick and smooth restart.
Réunion Travail POMEX
  • Preparation of SMED kits : Preassembled and preadjusted parts.
  • Reconfiguration of steps : Testing, document analysis, and collaboration with suppliers to ensure compatibility.
  • Documentation and training : Formalising procedures and raising team awareness.
  • Significant improvement in OEE (Overall Equipment Effectiveness) : Format change times were reduced from several hours to just a few minutes.
  • Increased team satisfaction : Elimination of inaccurate adjustments and associated frustrations.
  • Secondary benefits : Increased machine reliability and systematic revision of replaced components.