Qualification & validation (CQV / CSV)
Compliant equipment, utilities and computerised systems, with a file that stands up to inspection.
Putting equipment into service in a GMP environment means proving, with documents, that it does what it was designed to do and will keep doing it.
POMEX supports the qualification of equipment, utilities and computerised systems, from the validation plan to the final report. We work with production sites in Wallonia (Hainaut, Walloon Brabant, Namur, Liège), Brussels and northern France.
What we do
Our consultants cover the whole qualification and validation cycle:
- writing and reviewing validation master plans (VMP), risk assessments and traceability matrices;
- DQ, IQ, OQ and PQ protocols and execution, deviation management and summary reports;
- computerised system validation (CSV) according to GAMP 5 and Annex 11: specifications, testing, data integrity;
- periodic requalification and maintaining the validated state after changes (change control).
Our added value
Our consultants know the field: they have qualified filling lines, critical utilities and control systems. They speak the language of both technical teams and quality assurance, which shortens review cycles.
How we work
We adapt our support to your project:
- reinforcing a project team for a defined period;
- leading a qualification package, with commitment on deliverables;
- one-off support before an inspection or audit.

The expected result
A complete, clear validation file that stands up to inspection, delivered on the project schedule.
The stages of equipment qualification
Qualifying equipment means proving that it is correctly installed and works reproducibly, in line with specifications set in advance. It is the essential step before process validation.
- URS: the plant’s needs, ranked by criticality, are used to select the supplier and work with them;
- FAT: checks at the supplier on mechanical, hardware and documentation aspects;
- SAT: on-site tests in the real environment, tracking each deviation;
- IQ: documents, installation integrity, instrument calibration;
- OQ: operation under conditions of use, repeated tests;
- PQ: stability and performance in production.
Around these stages: an approved qualification plan, a risk analysis (FMEA) and computerised system validation (21 CFR Part 11, Annex 11).
Read the case study: qualifying new pharmaceutical production equipment →
Standards and guidelines covered
- EU GMP Annex 15: qualification and validation;
- EU GMP Annex 11: computerised systems;
- FDA 21 CFR Part 11: electronic records and signatures;
- GAMP 5 (ISPE): risk-based approach to computerised systems;
- ICH Q9: quality risk management;
- ASTM E2500: verification of manufacturing systems and equipment.
Frequently asked questions
Qualification shows that equipment or a facility complies and works as intended (IQ, OQ, PQ). Validation shows that a process, method or computerised system reproducibly delivers the expected result. Equipment qualification is a prerequisite for process validation.
It depends on criticality and complexity. A qualification plan approved from the start, a risk analysis that targets the tests and a well-prepared FAT at the supplier are the best ways to meet project deadlines.
Yes. We apply a risk-based approach inspired by GAMP 5 to demonstrate compliance with Annex 11 and 21 CFR Part 11: data integrity, audit trail, access management and electronic signatures.
Yes. Our consultants can join your team for a project or a set period, or take charge of the whole qualification file.
Our quality and validation case studies
LET’S TALK ABOUT YOUR PROJECT
Equipment to qualify or a system to validate?
Let’s talk about your project: URS, qualification plan, computerised system validation. A first, no-obligation conversation is enough to frame the need.


