• writing and reviewing validation master plans (VMP), risk assessments and traceability matrices;
  • DQ, IQ, OQ and PQ protocols and execution, deviation management and summary reports;
  • computerised system validation (CSV) according to GAMP 5 and Annex 11: specifications, testing, data integrity;
  • periodic requalification and maintaining the validated state after changes (change control).
  • reinforcing a project team for a defined period;
  • leading a qualification package, with commitment on deliverables;
  • one-off support before an inspection or audit.
Handshake between professionals

The stages of equipment qualification

Qualifying equipment means proving that it is correctly installed and works reproducibly, in line with specifications set in advance. It is the essential step before process validation.

  • URS: the plant’s needs, ranked by criticality, are used to select the supplier and work with them;
  • FAT: checks at the supplier on mechanical, hardware and documentation aspects;
  • SAT: on-site tests in the real environment, tracking each deviation;
  • IQ: documents, installation integrity, instrument calibration;
  • OQ: operation under conditions of use, repeated tests;
  • PQ: stability and performance in production.

Around these stages: an approved qualification plan, a risk analysis (FMEA) and computerised system validation (21 CFR Part 11, Annex 11).

Read the case study: qualifying new pharmaceutical production equipment →

Standards and guidelines covered

  • EU GMP Annex 15: qualification and validation;
  • EU GMP Annex 11: computerised systems;
  • FDA 21 CFR Part 11: electronic records and signatures;
  • GAMP 5 (ISPE): risk-based approach to computerised systems;
  • ICH Q9: quality risk management;
  • ASTM E2500: verification of manufacturing systems and equipment.

Frequently asked questions

What is the difference between qualification and validation?

Qualification shows that equipment or a facility complies and works as intended (IQ, OQ, PQ). Validation shows that a process, method or computerised system reproducibly delivers the expected result. Equipment qualification is a prerequisite for process validation.

How long does equipment qualification take?

It depends on criticality and complexity. A qualification plan approved from the start, a risk analysis that targets the tests and a well-prepared FAT at the supplier are the best ways to meet project deadlines.

Do you also validate computerised systems?

Yes. We apply a risk-based approach inspired by GAMP 5 to demonstrate compliance with Annex 11 and 21 CFR Part 11: data integrity, audit trail, access management and electronic signatures.

Can you reinforce an existing validation team?

Yes. Our consultants can join your team for a project or a set period, or take charge of the whole qualification file.

Let’s talk about your project: URS, qualification plan, computerised system validation. A first, no-obligation conversation is enough to frame the need.